DRUG COMBINATION PRODUCT DESIGN VERIFICATION TESTING
Timeline
Development activities were completed 2.5 months after contract was signed.
Benefit
Company successfully transitioned their vaccine from a vial to a prefilled syringe configuration.
We developed all test methods used to support their program and authored custom Test method protocols to meet their requirements.
ZebraSci led the following development activities:
- CCI: Dye Ingress
- Deep Cold CCI and Stopper Movement Studies
- Closure System Liquid Leakage
- Liquid Leakage at Syringe Plunger Stopper
- Flange to Plunger Rod Distance Dimensional Analysis
- Deliverable Volume Testing
- Luer Cone Breakage Resistance
- Tip Cap Removal Torque
- Needle Attachment Torque
- Break Loose and Glide Force
- Flange Breakage Resistance